The Collection

The Collection (JPG)

The Collection is a proposal by Trumark Homes (dba "TH Danville Investors LLC") to develop the 5.05 acre property located at the southeast corner of Camino Tassajara and Sherburne Hills Road into an 18 lot single family residential project. The subject property is currently occupied by Tassajara Nursery and is identified as 2550 Camino Tassajara. The Collection (the "proposed project") would consist of 18 single family detached residences, with a minimum of eight of these residences containing a small (i.e., <550 square foot) second dwelling unit = or "accessory dwelling unit".

Project: Rezoning, Major Subdivision and Final Development Plan - 18 lots
Project Location: 2550 Camino Tassajara
Tax Parcel Number: APN 217-010-008

Related Documents


  1. The Collection Project Description (PDF)
  2. Vesting Tentative Map January 2019 - Sheets 1 through 11 (PDF)
  3. Preliminary Landscape Plans August 28, 2018 - Sheets L-1 through L-6 (PDF)
  4. Preliminary Architectural Plans January 11, 2019 - Sheets A001 through A010 (PDF)
  5. Density Bonus Request Letter - March 11, 2019 (PDF)
  6. Eligibility of Accessory Dwelling Units to Count toward RHNA Letter - December 17, 2018 (PDF)
  7. Notice of Intent to Adopt a Mitigated Negative Declaration - March 18, 2019 (PDF)
  8. Draft Mitigated Negative Declaration of Environmental Significance - March 18, 2019 (PDF)
  9. Initial Study and Environmental Checklist Form - March 18, 2019 (PDF)
  10. Attachments A-1 thru A-4 - Development Yield Comparison Tables (PDF)
  11. Attachment B - Special Concern Area Danville 2030 General Plan Text (PDF)
  12. Attachment C - Amended Tree Survey and Report dated December 14, 2018 (PDF)
  13. Attachment D - Phase I Environmental Site Assessment dated October 5, 2017 (PDF)
  14. Attachment E - Environmental Noise Assessment dated March 7, 2018 (PDF)
  15. Attachment F - Traffic Impact Study (TIS) Report dated December 14, 2018 (PDF)
  16. Appendix A - Existing Turning Movement Counts (PDF)
  17. Appendix B - Existing Conditions Level of Service Worksheets (PDF)
  18. Appendix C - Existing plus Project Conditions Level of Service Worksheets (PDF)
  19. Appendix D - Cumulative Conditions Level of Service Worksheets (PDF)
  20. Appendix E - Cumulative plus Project Conditions Level of Service Worksheets (PDF)
  21. Appendix F - Town of Danville Site Plan Feedback (PDF)
  22. Attachment G - Preliminary Stormwater Control Plan dated January, 2019 (PDF)
  23. Attachment H - Geotechnical Feasibility Review dated September 18, 2018 (PDF)