• C-593 Front Street Creek Stabilization Project

  •  

    Project Name:  C-593 Front Street Creek Stabilization Project
    Project Description:   The work generally includes, but is not limited to, improving the slope stability where land sliding has occurred and improve habitat in the project area.
    The landslide was triggered following a large storm in December 2014. The landslide movement occurred near a soldier pile wall installation that was constructed in an adjacent area where land sliding occurred in December 2008.
    Project Type:    Engineering/ Civil
    Ownership:  Public
    Project Location:   Front Street - Along San Ramon Creek approximately 350 feet north of Diablo Road Bridge
    Environmental Documents:

    Initial Study

    Draft Mitigated Negative Declaration of Environmental Significance

       
       
       